新澳门六合彩官网

新澳门六合彩官网

H-E-B

Location
San Antonio, Texas
Project Size
24,000 SF
Completion Year
2012
HEB 新澳门六合彩官网 03
HEB 新澳门六合彩官网 01
HEB 新澳门六合彩官网 04
HEB 新澳门六合彩官网 02

Steam Plant Project Scope
新澳门六合彩官网 built a 4,000 sf steam plant for H-E-B adjacent to its existing manufacturing operation. The facility houses three boilers and the necessary water softening, deaerating and chemical treatment systems to service the manufacturing facility. 新澳门六合彩官网 also installed a steam generator to supply sterile steam to H-E-B鈥檚 aseptic process. Additionally, 新澳门六合彩官网 replaced the bakery鈥檚 Spiral Freezer, and remodeled the refrigeration of the existing 20,000 sf bakery to include a Glycol & Chilled Water System for H-E-B.

Sprial Freezer Installation Project Scope
新澳门六合彩官网 replaced H-E-B鈥檚 frozen dough spiral freezer with a new 12,000 pounds per hour spiral freezer. The existing egg and yeast coolers, case packaging mezzanine and holding freezer were also completely remodeled. A new 3,900 sf refrigeration machine room, including five new ammonia compressors, to support the new spiral freezer was also constructed.

Glycol & Chilled Water System Project Scope
新澳门六合彩官网 upgraded the chilled ingredient water system by replacing the existing falling film chiller and header piping to H-E-B鈥檚 frozen dough mixers. 新澳门六合彩官网 also installed a new ammonia glycol heat exchanger chiller package to provide a jacketed cooling system to various mixers. A new controls system was also part of this project.

Key Team Members

新澳门六合彩官网's leadership has the expertise and understanding necessary to advise you, even on the most complex challenges.

Meet 新澳门六合彩官网's Leadership Team
Next Slide